Doric Properties
January 31st, 2011 // 6:10 pm @ Andrew
Contractor: Atlantica Mechanical Contractors In an effort to combat rising energy costs, Doric Property Management chose Lochinvar Knight commercial condensing boilers for conversion from oil fired boilers to natural gas fired appliances in four of their properties in the Clayton Park region of Halifax NS. 21 Chadwick Place, 61 Chadwick Place and 290 Willett Street [...]
Category : Projects
Controls & Equipment Moncton Office
January 27th, 2011 // 6:10 pm @ Andrew
Lochinvar & MacLeod & Grant team up with Controls & Equipment to heat their new home in Moncton. With a major expansion – more than doubling the building size – Controls & Equipment was on a quest to find the most effecient products on the market and chose the Lochinvar Knight boiler with its new [...]
Category : Projects
Fredericton Convention Centre
January 27th, 2011 // 5:53 pm @ Andrew
Contractor: Beaulieu Plumbing & Mechanical Located in the Fredericton business district, the new 1,000 seat Fredericton Convention Centre is opening in January 2011. Domestic hot water for the convention centre is supplied by three AO Smith Cyclone Xi BTH-150 natural gas condensing domestic hot water heaters installed by Beaulieu Mechanical.
Category : Projects
Park Place Lakeside
November 18th, 2010 // 5:10 pm @ Andrew
Contractor: Atlantica Mechanical Contractors Inc. Park Place Lakeside is part of the Armour Group’s Park Place Corporate Campus – the HRM’s largest suburban office complex – and is a LEED targeted building retrofitted in 2010. Two Lochinvar SYNC SBN1500 fully condensing natural gas-fired boilers supplying 3 million BTU’s to the primary heating system. The boilers [...]
Category : Projects
40 Highfield Park Dr.
July 9th, 2010 // 10:12 am @ Andrew
Contractor: Davies Plumbing & Heating Ltd 40 Highfield Park Dr was built in 2009, the building office space is shared by companies such as Lockheed Martin and Stantec Consulting. Primary heat and cooling source for the building is air-to-water heat pumps with a condensing boiler back up for the heating season. Two Lochinvar Knight XL [...]
Category : Projects
Saputo Dairy
July 9th, 2010 // 9:01 am @ Andrew
Saputo Dairy in Dartmouth Nova Scotia retrofitted two existing firetube boilers for natural gas operation.
- Weishaupt G40/2-A, ZM-NR fully modulating natural gas burner with sliding head, W-FM200 Linkageless Control System, and VFD on the burner motor, on a 250BHP Firetube Boiler.
- Weishaupt WM-G 10/3-A, ZM fully modulating natural gas burner with W-FM50 Linkageless Control System on a 75BHP Firetube Boiler.
Category : Projects
St. John Hospital
May 30th, 2010 // 4:22 pm @ Andrew
Saint John Regional Hospital, in Saint John New Brunswick, installed a Cheminée Lining.e Inc. manufactured free standing stack and custom boiler breeching.
Category : Projects
Dr. Everett Chalmers Hospital
December 23rd, 2009 // 1:56 pm @ Andrew
A 115′ tall Cheminée Lining.e Inc model STS 316 stainless steel free standing stack (single structural shell) installed at Dr. Everett Chalmers Hospital in Fredericton NB.
Category : Projects
Mount Allison University Stack Liner
December 23rd, 2009 // 11:40 am @ Andrew
Mount Allison University free standing stack re-lined with a 153′ tall model STS (single structural shell) 316 stainless steel liner from Cheminée Lining.e Inc.
Category : Projects
York Manor
December 21st, 2009 // 4:28 pm @ Andrew
Contractor: Direct Mechanical Ltd. An expansion at York Manor in Fredericton NB included four Lochinvar Knight KBN800 XL fully condensing boilers for both space heating and domestic hot water.
Category : Projects